Client asking for a charging station?
Book only the step you're missing.
For engineering firms, installers and integrators. Elektro Charge's consulting has six steps, and each one is booked separately.
- Project
- Your client's charging station
- Scope
- Only the missing steps
Steps
- Feasibility analysis
- Power utility
- Service entrance
- Charger installation
- Commissioning
- Cheaper energy
For engineers, installers and integrators
- Six steps, each booked separately.
- Just the feasibility analysis, or only the steps your project is missing.
- From feasibility analysis to the charger live in the charging app.
more than4,300charging sessions completed at the points we install, operate and monitor.
Can I book just part of a charging station project?
Yes. Elektro Charge's consulting goes from feasibility analysis to a working charger, in six steps, and each one is booked separately. An engineering firm, installer or integrator can book just the feasibility analysis, so the client can decide before the build is quoted, or only the steps their project is missing.
Where quotes usually get stuck
The charger is the easy part to quote. What changes the project comes before and after it.

The power the property has
Not every property has power to spare for a fast charger, and that, not the charger, can be what limits the project. If it isn't enough, the project needs a higher contracted load, a new service entrance or utility work.
The process with the utility
Before the connection, the local grid has to be analyzed and sometimes expanded, with the request and follow-up at the power utility. It's one of the steps we can take on.
The client's question: is it worth it?
Before approving the work, the client wants to know whether the site will earn. That's the question the feasibility analysis answers, with data on the site and the charge points around it.
From charger installed to charger live
Installing isn't the end: commissioning remains, with the charger wrap and the charger published in the charging app.
The six steps, booked separately
The steps of Elektro Charge's consulting, in project order. Each one is booked on its own: your firm keeps what it already does, and we take on what's missing.
Technical and financial feasibility analysis
- Vehicle traffic
- Estimated sessions and revenue of nearby charge points within 2 km
- Price per kWh analysis and suggestion
Process with the power utility
- Local grid analysis
- Grid expansion request
- Process management and hiring the engineering team
Service entrance
- Equipment purchase
- Labor and materials
- Civil and electrical work
Charger installation
- Charger and transformer
- Labor and materials
- Civil and electrical work
Commissioning and start-up
- Charger wrap
- The charger live in the charging app
Cheaper energy
Two common ways to use it
The scope is yours. These are the two requests that best fit someone quoting for a client.
Just the feasibility analysis
To bring your client, before quoting the build, the answer on whether the site can earn: vehicle traffic, nearby charge points and price per kWh.
Only the missing steps
Your firm does what it already does, and we take on the rest. For example: the build stays with you, and the utility process and commissioning are ours.
Step one is the feasibility analysis
Before quoting the build, a feasibility analysis of the site shows your client whether it can earn. It's the first step of our consulting and can be booked on its own.
See our consultingOur experience comes from our own operation
Elektro Charge installs, operates and monitors its own fast charge points. These numbers come from that operation.
- more than4,300charges completed
- more than100MWhof energy delivered
- more than500unique drivers served
Questions from people quoting for a client
Questions about each step are on the consulting page.
Can my firm do the build while you take just part of the project?
Yes. Each step is booked separately: the build can stay with your firm, and we take on only what's missing, such as the feasibility analysis, the process with the power utility or commissioning.
Does Elektro Charge also install the charger?
If you want: it's one of the steps, with the charger and transformer, labor and materials, and civil and electrical work. If your firm already does the build, that step stays with you.
My client wants to know if it's worth it before approving the work. Where do I start?
With the feasibility analysis. With vehicle traffic at the site, the charge points around it and a suggested price per kWh, the client decides before approving the build quote.
How do I request steps for a client's project?
Tell us where your client's site is and which steps the project is missing, through the form or on WhatsApp. Pricing is on request.
Reading before we talk
Posts from our blog on construction, cost, location and chargers.
- How to install a charging station: work, utility and timelines
- How much it costs to install a charging station: what goes into the bill
- Where to install a charging station: how to choose the location
- Solar energy for a charging station: how to lower the cost of the kWh
- DC Fast Charging: what it is, how it works and where to find it
- CCS2 vs CHAdeMO: which connector does your EV use?