Curitiba to São Paulo by Electric Car: Is It Feasible? The Complete Route
The short answer
Yes: it's about 408 km between Curitiba and São Paulo via the BR-376/BR-116, and even cars with smaller range (300 km WLTP) make the trip with just one fast-charging stop. There are more than 15 DC charging points along the route, and a typical stop of about 25 minutes halfway (for example, in Itapetininga) is enough to complete the trip comfortably.
It's approximately 410 km between Curitiba and São Paulo. In 2026, with the expansion of fast charging stations on Brazilian highways, this trip is already routine for thousands of electric car drivers. Here is the complete route, where to stop and how much it costs.
The short answer: yes, it's entirely feasible
Curitiba to São Paulo via the BR-376/BR-116 is 408 km. Even the electric cars with the smallest range (300 km WLTP) make the trip with just one fast-charging stop. Models with a larger battery — above 60 kWh — can complete the route without stopping, depending on driving style and conditions. Before hitting the road, see the Elektro Charge charging stations in Pinhais and Boqueirão, open 24 hours.
The fast-charging infrastructure on the Curitiba-São Paulo axis has improved dramatically. In April 2026, there are more than 15 fast DC charging points (50 kW or more) distributed along the route, operated by networks like Shell Recharge, Vibra, Zletric and Tupinambá.
The two main routes
Route 1: BR-376 + BR-116 (via Registro)
Distance: ~408 km. Estimated time: 5h30 to 6h30 (with one charging stop). It's the most used route and has the best charging-station coverage. The Paraná stretch of the BR-376 has good road surface and charging stations in Ponta Grossa, Itapetininga and Registro.
Route 2: BR-116 (via the Régis Bittencourt highway)
Distance: ~420 km. Estimated time: 6h to 7h. The Régis Bittencourt is more winding and has mountain stretches, but it has charging stations at strategic points like Cajati, Juquitiba and Embu das Artes. Consumption tends to be slightly higher due to the terrain.
Strategic fast-charging (DC) stops
- Km 0 — Pinhais/Curitiba: Elektro Charge, 60 kW DC, CCS2, 24h. The ideal starting point.
- Km 110 — Ponta Grossa: Shell Recharge, 150 kW DC. Excellent for a quick 15-min charge.
- Km 200 — Itapetininga: Zletric, 60 kW DC. A strategic stop halfway along.
- Km 310 — Registro/Juquitiba: Vibra, 75 kW DC. The last charge before SP if needed.
- Km 380 — Embu das Artes: Shell Recharge, 150 kW DC. For those who need to arrive in the capital with a charge.
Charging planning: a real scenario
Consider a BYD Dolphin (44.9 kWh, WLTP range of 340 km) leaving Curitiba with a 100% charge:
- Curitiba → Itapetininga (200 km): arrives with approximately 35-40% battery.
- Charge in Itapetininga: 25 minutes on the 60 kW charger, going from 35% to 80%.
- Itapetininga → São Paulo (208 km): arrives with 20-25% battery. Comfortable.
Total extra time due to charging: just 25 minutes. Considering that on a 5-6 hour trip you would already make a stop for coffee or a restroom, the real added time is close to zero.
How much does the electric trip cost vs. combustion
Here are the numbers for April 2026:
| Item | Electric car | Flex car (gasoline) |
|---|---|---|
| Distance | 408 km | 408 km |
| Consumption | ~75 kWh | ~34 liters |
| Cost/unit | R$ 1.20/kWh (fast DC) | R$ 6.30/liter |
| Total cost | R$ 90 | R$ 214 |
| Savings | R$ 124 per leg (58% cheaper) | |
Round trip, the savings reach nearly R$ 250. In a year with four trips to São Paulo, that's R$ 1,000 saved on this route alone.
The Curitiba-São Paulo electric trip is no longer an adventure. It's an economical, quiet routine, with more than enough infrastructure for any model sold in Brazil.
Practical tips for the trip
- Charge on DC before leaving: Elektro Charge in Pinhais is the ideal point. 30 minutes and you leave with 80-100%.
- Plan the stop in the middle: regardless of range, a 20-30 min stop at km 200 makes the trip safer and more comfortable.
- Download the A Better Route Planner (ABRP) app: it calculates the route considering your model, battery, temperature and terrain.
- Keep 80-110 km/h: above 120 km/h, consumption grows exponentially. Every 10 km/h above 100 reduces range by ~10%.
- Preheat the battery: on cold days (common on the mountain stretch), activate battery preconditioning 20 minutes before reaching the DC charger.
- Have a plan B: know at least two charging stations on each leg. If one is occupied or under maintenance, you have an alternative.
What to expect from the future of this route
The Curitiba-São Paulo axis is one of the most important road corridors in Brazil. Concessionaires like CCR and Arteris have already signed contracts to install ultra-fast chargers (150-350 kW) every 100 km by the end of 2027. That means that, soon, a charging stop will take less than 10 minutes.
In addition, the electrification of truck fleets on this axis should accelerate the installation of megachargers, which could also be used by passenger cars during low-demand hours.
Start the trip with a full charge
Elektro Charge, in Pinhais, is at the exit from Curitiba toward the BR-116. With 60 kW DC fast charging, a CCS2 connector and 24-hour operation, it's the perfect starting point for the trip to São Paulo. And while your car charges, you enjoy a distinctive dining experience — much better than gas-station coffee.
Before hitting the road, check out the step-by-step guide to charging at an Elektro Charge point: it's six steps, from the CCS2 cable to payment on the charger itself.
Heading to São Paulo?
Start at Elektro Charge. 60 kW DC fast charging, 24h, with dining in Pinhais.
View on Google Maps →Frequently asked questions
How long does Curitiba to São Paulo take by electric car?
Via the BR-376 and BR-116 it's about 408 km, 5h30 to 6h30 with one charging stop. Via the Régis Bittencourt it's about 420 km and 6h to 7h, on a more winding road, with slightly higher consumption because of the terrain.
Where to charge along the way?
There are fast-charging stops in Ponta Grossa, Itapetininga, Registro or Juquitiba and Embu das Artes, plus the starting point in Pinhais. Confirm in the app that each charger is working and keep a second point as a plan B on each leg.
What speed should I use on the highway?
Between 80 and 110 km/h. Above 120 km/h consumption rises a lot: every 10 km/h above 100 reduces range by about 10%. On cold days, activate battery preconditioning about 20 minutes before reaching the DC charger.
Which app helps plan this trip?
A Better Route Planner (ABRP) calculates the route based on your model, battery, temperature and terrain. Also use the car manufacturer's app and confirm the chargers' status in the networks' apps before leaving.
Is this route's infrastructure expected to improve?
Concessionaires like CCR and Arteris have already signed contracts to install ultra-fast chargers, 150 to 350 kW, every 100 km by the end of 2027. With that, a charging stop should take less than 10 minutes, and the electrification of truck fleets should accelerate the installation of megachargers.


